TM 11-5840-281.12.1
4-6.
UNPACKING. (CONT)
1.
Remove one screw (1), two flat washers (2), and one nut (3) from securing ring (4).
2.
Remove securing ring (4) from drum (5).
3.
Remove lid (6) from drum (5).
4.
Remove nine shipping pads (7), containing waveguides and hardware, from drum (5).
CHECKING UNPACKED EQUIPMENT
Inspect all equipment for possible damage incurred during shipment. If any equipment has been damaged, report the
damage on DD Form 6 (Packing Improvement Report).
Check the equipment against the packing slip to ensure shipment is complete. Report any discrepancies In accordance
with Maintenance Forms, Records, and Reports (para 1-3). The equipment should be placed in operation even though a
minor assembly or part, that does not affect proper functioning, Is missing.
Check that all applicable MWOs listed in DA PAM 310-1 have been applied to the equipment.
4-7.
RADAR SET ASSEMBLY AND INSTALLATION INSTRUCTIONS.
NOTE
Refer to TM 11-5895-474-12 addendum for assembly and installation instructions when
radar set is part of Landing Control Central AN/TSQ-71 B.
Two persons are required to assemble and install radar set. Complete installation for a single runway, Including
equipment siting, assembly, radar target simulator siting, and preliminary servicing and adjustment, can be accomplished
in 4 hours (8.5 task hours). Electronic Equipment Tool Kit TK-101/G is used for all assembly and installation procedures.
A lifting device, with suitable weight capacity, is required to lift and position components of radar set. The weight of the
individual components is given at the beginning of each procedure.
4-21