TM 11-5840-360-14-1-1
Table 5-2 Preventive Maintenance Schedule
Preventive Maintenance
Procedure
Activity
Paragraph
W
M
S-A
A
1. Performance Check
X
X
X
X
2. Inspect all equipments
X
X
X
3. Clean all equipments
X
X
X
4. Lubricate Pedestal AB-1247/1247A
X
X
X
5. Check Belt Tension AB-1247/1247A
X
X
X
6. Check Sheave Alignment AB-1247/1247A
X
X
7. Inspect Drive System AB-1247/1247A
X
8. Inspect Cover Gasket AB-12L47/1247A
X
9. Lubricate Pedestal AB-1248 (V4)
X
X
X
10. Check Belt Tension AB-1248 (V4)
X
X
X
11. Clean Air Filters RT-1241 (V4)
X
X
X
12. Check Sheave Alignment AB-1248 (V4)
X
X
13. Inspect Drive System AB-1248 (V4)
X
14. Inspect Access Hatch Gasket AB-1248 (V4)
X
15. High Voltage Arc Prevention
As Required
As Required
* Frequency: W - Weekly, M - Monthly, S-A - Semiannually, A - Annually
3. Temporarily snug the four motor mounting bolts.
5.7.1.3 Belt Tension Check and Alignment. - Gain
Rotate the drive sheave a few times to check for ease of
operation, and then check belt tension again. If the
a tension gauge, check for belt deflection of 1/8" when 4
tension is correct, tighten the four motor mounting bolts.
to 5 pounds of tension are applied to the belt midway
If the tension is incorrect, repeat this procedure.
incorrect, adjust as follows:
5.7.1.4 Sheave Alignment Check. - Check sheave
1. Loosen the four motor mounting bolts. Insert
alignment as follows:
screwdriver through tension adjustment slot and engage
teeth on motor mounting plate.
2. Gain access per steps 1,2 and 3 of paragraph
2. To increase belt tension, move the motor away
5.7.1.2. Set Indicator (master) POWER switch to
OFF.
from the driven sheave. To decrease belt tension,
move the motor toward the driven sheave.
5-4