TM 11-5840-360-14-1-1
Table 2-12 Switching Units Internal Jumpers (Cont'd)
Dual Radar (V3) Jumper List for Two Indicators
Dual Radar (V3) Jumper List for Three Indicators
(Cont'd)
(Cont'd)
E. Connect 75-ohm coax between J1 (center
D. VRM A2A7
conductor) and S1B-27A; connect shield
to A1E10A.
1. Link E1 to E3
F. Connect 75-ohm coax between J2 (center
conductor) and S1B-25A; connect shield
E. Position Transmission A2A8
to A1E5A.
V.
1. Remove link E1 to E2
Transmitter) (3)
2. Install U7
A. Pulse and Driver PCB A1
F. EBL A2A9
1. Link A1 to D1
1.
Link E2 to E4
2. Link A2 to D2
2
Link E8 to E10
3. Link A3 to D3
3.
Link E13 to E15
4. Link E1 to F1
4.
Link E16 to E17 (Rev. C and up only)
VI.
5.
Link E19 to E20
Transmitter) (3)
G.
A. Pulse and Driver PCB A1
1. Link A1 to D1
1. Link E1 to E2
2. Link A2 to D2
3. Link A3 to D3
II. Indicator B (4/5)
4. Link E1 to F1
A. Video Amplifier A2A1
Dual Radar (V3) Jumper List for Three Indicators
1. a. With EBL remove link E1 to E2
I.
Indicator A (4/5)
b. Without EBL link E1 to E2
2. Remove link E3 to E4
A. Video Amplifier A2A1
B. Data Storage A2A3
1. a. With EBL remove link E1 to E2
b. Without EBL link E1 to E2
1. Remove link E1 to E2
2. Remove link E3 to E4
2. Remove link E3 to E4
B. Data Storage A2A3
1. Remove link E1 to E2
1. Link E33 to E35 to a position E17
2. Remove link E3 to E4
through E26 (will change during
alignment)
2. Link E32 to E34 to a position E17
through E26 (will change during
1. Link E33 to E35 to a position E17
alignment)
through E26 (will be changed during
3. Link E40 to E36
alignment)
4. Link E54 to E17 (may change during
2. Link E32 to E34 to a position E17
alignment)
through E26 (will be changed during
5. Link E48 to E49
alignment)
6. Link E44 to E46
3. Link E40 to E36
4. Link E54 to E17 (may change during
D. VRM A2A7
alignment)
5. Link E48 to E49
1. Link E1 to E3
6. Link E44 to E46
2-46