TM 11-6625-1831-13
2-5.
INSTALLATION AND PREPARATION FOR USE
This task covers:
a.
Installation
b.
Connection to power
LOCATION/ ITEM
ACTION
REMARKS
INSTALLATION
1.
TEST SET CASE
a.
Pressure Relief Valve
Press.
Makes air pressure equal inside
case
b.
Eight cover latches
Pull down. Release from cover.
c.
Cover
Remove.
2.
COVER
a.
Hinged lid
Push three fasteners in. Pull
lid open.
b.
Storage compartment
Remove Cable W3.
Cables are marked with ID numbers.
2-8