2-12. Power Meter 2A4, Coarse Zero
manual TM 11-5895-578-34 (when published),
(fig. 2-7)
covering Radar Surveillance Set AN/APS-94D,
To coarse zero power meter 2A4, proceed as
contains the procedures for operating the test set.
follows:
Table 2-5 lists the cables and cable connections
a. Turn the RF power to the power meter off
for testing the AN/APS-94D modules.
by turning the RF test set POWER switch to
OFF (fig. 2-7).
b. Set the power meter RANGE selector switch
Perform the following when use of the test set
(fig. 2-7) to COARSE ZERO.
group is completed. The control unit-RF test
e. Adjust the COARSE ZERO screwdriver ad-
set configuration covered in a and b below covers
justment until the meter indicates zero.
the control unit-module test set configuration.
2-13. Operating Procedure
a Control Unit-RF Test Sat Configuration.
(1) Set the RF test set POWER switch to
The test set group is used to test and align,
and as an aid in troubleshooting Receiver-
OFF (fig. 2-6).
Table 2-5. Module Test Set, Module Extender Cables
the RF test set and secure them by fastening the
(2) Set the control unit RT POWER switch
to OFF and the control unit PRIME POWER-
draw-bolt latches (fig. l-l and 1-2).
b. Control Unit-Module Test Set Configura-
POWER switch to OFF (fig. 26).
(3) Disconnect the test cables connecting
tion.
(1) If ON, set the module test set HIGH
2-9).
VOLTAGE switch to OFF (fig. 2-8).
(2) Set the module test set PRIME POWER-
(4) Disconnect subassembly 2A1 and remove
POWER switch to OFF (fig. 2-8).
it from the RF test set (para 2-8).
(3) Disconnect the test cables connecting the
(5) Remove the receiver-transmitter from
control unit to the module test set (fig. 2-10).
).
(4) Disconnect any module extender cables
cables between the con-
that may be connected to the module test set (fig.
trol unit and the RF test set (fig. 2-9).
2-10).
(7) Place the cables in the storage compart-
(5) Place the cables in the storage compart-
ment of the control unit (fig. l-l).
ments of the control unit (fig. l-l) and the
(8) Place subassembly 2A1 and the minor
module test set ( fig. 13).
components in the RF test set storage compart-
(6) Place the covers on the control unit and
ment
the module test set and secure by fastening the
(
the covers on the control unit and
latches (figs. l-l and 1-3).