(a) When
b
the
equipment
is
initially
installed.
organizational PMCS procedures.
(b) When the equipment is reinstalled.
NOTE
(3) Standby Condition. Perform the 25-hour
checks and operator/crew PMCS at least once a week if
door opening and closing procedures.
equipment is maintained in a standby condition.
Table 3-2 Organizational Preventive Maintenance Checks and Services
Item
Interval
Item to be
no
(flying
Inspected
Procedures
hours)
1
25
Interconnecting cables
Check all interconnecting cables for cracks or breaks.
2
25
Connectors
Check all connectors for tightness.
3
25
Equipment mounts
Check for loose or missing nuts and bolts. Tighten or replace as required.
4
50
Exterior surfaces
Remove all dirt, rust, and corrosion from components.
5
100
Data transmitting set
Perform preflight and inflght check (para 2-4 ).
3-10.
Access Hatch Door Opening and Closing
CAUTION
Procedures
When opening a hatch door, hold on to the
door until it has reached its travel limits to
prevent possible door damage.